beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & Serving
Personal
WatchlistCompare
?
Sign in
magic link · no password
LIVE──────── · ──:──:── UTCabout
beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & Serving
Personal
WatchlistCompare
?
Sign in
magic link · no password
Back to e2b-dev/infra
[STATUS / STALLING]

Is e2b-dev/infra still actively maintained? (May 2026)

Partially. e2b-dev/infra is stalling on beam — still maintained, but momentum has dropped over the last 7 days. Current velocity score: 1.9/10.

What the signals say
  • Last commit5 days ago (May 17, 2026)
  • Contributors46
  • Stars1,106 (+9 in last 7 days)
  • Star delta (30d)+79 in last 30 days
  • Velocity score1.9/10 (stalling)
What ‘stalling’ means on beam

Stalling means the velocity score has declined over the last 7 days. The repo is still maintained, but adoption signals or commit cadence have softened. Full methodology →

Frequently asked

Is e2b-dev/infra still actively maintained? (May 2026)

Partially. e2b-dev/infra is stalling on beam — still maintained, but momentum has dropped over the last 7 days. Current velocity score: 1.9/10.

How is beam classifying e2b-dev/infra?

Beam classifies e2b-dev/infra as stalling with a velocity score of 1.9/10. Beam fuses code activity, package adoption, sentiment, research citation, and production signals into a single 0–10 score; the classification thresholds are explained on /about.

When was the last commit to e2b-dev/infra?

The most recent commit to e2b-dev/infra was 5 days ago (May 17, 2026).

How can I track e2b-dev/infra's status going forward?

Beam refreshes e2b-dev/infra's velocity score and class daily. The live tool profile is at /tools/726; the JSON API endpoint is /api/v1/tools/726.

Full tool profile Methodology API
LIVE──────── · ──:──:── UTCabout