beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & ServingVector DBs
Personal
WatchlistCompareWeekly report
?
Sign in
magic link · no password
LIVE──────── · ──:──:── UTCabout
beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & ServingVector DBs
Personal
WatchlistCompareWeekly report
?
Sign in
magic link · no password
Back to topoteretes/cognee
[STATUS / STALLING]

Is topoteretes/cognee still actively maintained? (July 2026)

Partially. topoteretes/cognee is stalling on beam — still maintained, but momentum has dropped over the last 7 days. Current velocity score: 1.7/10.

What the signals say
  • Last commit4 days ago (July 2, 2026)
  • Contributors191
  • Stars27,250 (+1,618 in last 7 days)
  • Star delta (30d)+9,550 in last 30 days
  • Velocity score1.7/10 (stalling)
What ‘stalling’ means on beam

Stalling means the velocity score has declined over the last 7 days. The repo is still maintained, but adoption signals or commit cadence have softened. Full methodology →

Frequently asked

Is topoteretes/cognee still actively maintained? (July 2026)

Partially. topoteretes/cognee is stalling on beam — still maintained, but momentum has dropped over the last 7 days. Current velocity score: 1.7/10.

How is beam classifying topoteretes/cognee?

Beam classifies topoteretes/cognee as stalling with a velocity score of 1.7/10. Beam fuses code activity, package adoption, sentiment, research citation, and production signals into a single 0–10 score; the classification thresholds are explained on /about.

When was the last commit to topoteretes/cognee?

The most recent commit to topoteretes/cognee was 4 days ago (July 2, 2026).

How can I track topoteretes/cognee's status going forward?

Beam refreshes topoteretes/cognee's velocity score and class daily. The live tool profile is at /tools/578; the JSON API endpoint is /api/v1/tools/578.

Full tool profile Methodology API
LIVE──────── · ──:──:── UTCabout