beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & Serving
Personal
WatchlistCompare
?
Sign in
magic link · no password
LIVE──────── · ──:──:── UTCabout
beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & Serving
Personal
WatchlistCompare
?
Sign in
magic link · no password
Back to BloopAI/vibe-kanban
[STATUS / STABLE]

Is BloopAI/vibe-kanban still actively maintained? (May 2026)

Yes. BloopAI/vibe-kanban is classified stable on beam — healthy maintenance, no momentum loss. Current velocity score: 1.1/10.

What the signals say
  • Last commit28 days ago (April 24, 2026)
  • Contributors62
  • Stars26,298 (+217 in last 7 days)
  • Star delta (30d)+1,243 in last 30 days
  • Velocity score1.1/10 (stable)
What ‘stable’ means on beam

Stable means the repo’s velocity score has been consistent over the last 7 days — healthy maintenance signals, no momentum loss, no contributor drop-off. Full methodology →

Frequently asked

Is BloopAI/vibe-kanban still actively maintained? (May 2026)

Yes. BloopAI/vibe-kanban is classified stable on beam — healthy maintenance, no momentum loss. Current velocity score: 1.1/10.

How is beam classifying BloopAI/vibe-kanban?

Beam classifies BloopAI/vibe-kanban as stable with a velocity score of 1.1/10. Beam fuses code activity, package adoption, sentiment, research citation, and production signals into a single 0–10 score; the classification thresholds are explained on /about.

When was the last commit to BloopAI/vibe-kanban?

The most recent commit to BloopAI/vibe-kanban was 28 days ago (April 24, 2026).

How can I track BloopAI/vibe-kanban's status going forward?

Beam refreshes BloopAI/vibe-kanban's velocity score and class daily. The live tool profile is at /tools/569; the JSON API endpoint is /api/v1/tools/569.

Full tool profile Methodology API
LIVE──────── · ──:──:── UTCabout