beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & Serving
Personal
WatchlistCompare
?
Sign in
magic link · no password
LIVE──────── · ──:──:── UTCabout
beam
beam
Discover
PulseActivityAnalyticsBest forMapOrgs
Niches
AgentsMCPRAGCoding AssistantsInference & Serving
Personal
WatchlistCompare
?
Sign in
magic link · no password
Back to juyterman1000/entroly
[STATUS / STABLE]

Is juyterman1000/entroly still actively maintained? (May 2026)

Yes. juyterman1000/entroly is classified stable on beam — healthy maintenance, no momentum loss. Current velocity score: 0.5/10.

What the signals say
  • Last commit6 days ago (May 16, 2026)
  • Contributors3
  • Stars381 (+26 in last 7 days)
  • Star delta (30d)+52 in last 30 days
  • Velocity score0.5/10 (stable)
What ‘stable’ means on beam

Stable means the repo’s velocity score has been consistent over the last 7 days — healthy maintenance signals, no momentum loss, no contributor drop-off. Full methodology →

Frequently asked

Is juyterman1000/entroly still actively maintained? (May 2026)

Yes. juyterman1000/entroly is classified stable on beam — healthy maintenance, no momentum loss. Current velocity score: 0.5/10.

How is beam classifying juyterman1000/entroly?

Beam classifies juyterman1000/entroly as stable with a velocity score of 0.5/10. Beam fuses code activity, package adoption, sentiment, research citation, and production signals into a single 0–10 score; the classification thresholds are explained on /about.

When was the last commit to juyterman1000/entroly?

The most recent commit to juyterman1000/entroly was 6 days ago (May 16, 2026).

How can I track juyterman1000/entroly's status going forward?

Beam refreshes juyterman1000/entroly's velocity score and class daily. The live tool profile is at /tools/2713; the JSON API endpoint is /api/v1/tools/2713.

Full tool profile Methodology API
LIVE──────── · ──:──:── UTCabout